ADU permitting often takes two to six months, from submitting a complete application to getting approval. Some cities issue permits in a few weeks, while others take six months or longer. The time depends on local rules, the size and type of ADU, how busy the city is, and whether your plans need changes. This estimate covers the permit review; design, plan preparation, and construction take extra time.
A small backyard unit with clear plans may move through review faster than a large addition or a unit built above a garage. Even similar projects can take different amounts of time in nearby cities, since each city sets its own process and review pace. A first review may take several weeks, and every round of changes can add more time. So, a useful estimate is a range—not a promise of a set approval date.
What happens during ADU permitting?
Before construction can begin, the city checks that the ADU plans meet local rules and safety codes. Depending on the project, the review may cover the site plan, building design, structure, plumbing, electrical work, energy use, and fire safety. Some cities also review parking, tree removal, drainage, or access to the property.
The process often starts with an application and a set of plans. City staff check whether the file is complete. If key forms or drawings are missing, they may ask you to add them before the review starts. Once the application is accepted, staff review the plans and send comments or approval. If they ask for changes, your designer or builder updates the plans and sends them back.
How long does each step take?
Preparing plans: A few weeks to a few months. A simple design on a clear site may take less time. A project with tricky site conditions, custom plans, or several design changes can take longer.
City review: Often one to three months for the first review, though local wait times vary. Some cities have set review periods for certain ADUs. Others may take longer, especially during busy times or when staff need input from more than one department.
Plan changes and rechecks: A few weeks to several months. The city may ask for more detail, or it may flag items that need to change. How quickly the team responds matters. The city then needs time to review the updated plans.
Permit issue: Once all reviews are approved and fees are paid, the city issues the permit. This final step may take days or weeks, based on the city’s process.
What can slow down approval?
Incomplete plans are a common cause of delay. If a drawing lacks key details, the city may pause its review or ask for a new version. It also takes time to answer review comments, revise plans, and submit them again. Before filing, check the city’s application list and make sure each required form and drawing is ready.
Site conditions can add time, too. A steep lot, a flood risk, a protected tree, or limited access may call for extra review. A garage conversion may need checks that differ from those for a new backyard unit. If the ADU connects to sewer, water, or power, the utility work may need separate approval.
Timing also depends on the city’s workload. A city with many permit requests may take longer to start a review. Staff holidays, seasonal demand, and local changes to ADU rules may affect the wait. If a project needs a hearing or approval from a separate board, the process may take longer than a basic permit review.
How can you keep the process moving?
Start by checking your city’s ADU rules and permit checklist. Ask what plans, reports, and forms are needed for your property. If the city offers a pre-application meeting, use it to raise questions before you pay for a full set of plans.
Hire a designer or builder who knows the local process. They can help prepare clear plans and make sure the application covers the work. This does not guarantee a quick approval, but it can reduce avoidable requests for missing details.
After you submit, track the application and reply to city comments as soon as you can. Read each request closely, and send a full response rather than addressing only part of it. If a comment is unclear, ask the reviewer what they need before changing the plans.
Does the permit timeline include construction?
No. The permit timeline ends when the city issues the permit. After that, you still need to schedule the work, order materials, and build the ADU. Inspections take place during construction, and the city may need to approve the finished unit before it can be used.
It helps to keep permitting and construction in separate parts of your schedule. Do not set a move-in date based only on the expected permit window. Add time for plan changes, contractor availability, weather, and inspection visits.
A practical estimate
For early planning, allow two to six months for permitting and more time if the project is complex or the city has a long queue. Ask your city for its current review estimate, and confirm whether that estimate begins when you submit or when staff accept a complete application.
The best timeline comes from your specific plans, site, and city. A clear application can help, but no one can promise an exact approval date. Plan for extra time so a request for changes does not put the whole project behind schedule.